Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
atlanta_move [2017/04/19 05:28] – Grammar fix Carlos Pedrazaatlanta_move [2019/02/23 20:19] (current) – [State of the Campaign] Carlos Pedraza
Line 76: Line 76:
 Peters claimed the deal would end up reimbursing Axanar for "a portion of the investment we made," based on future rentals of the studio. He failed to explain either how much of a portion or for how long the profit-sharing arrangement would last, but did say those payments would "go back into Axanar Productions so we can continue telling the story of Axanar and fulfilling our commitments to donors." Peters claimed the deal would end up reimbursing Axanar for "a portion of the investment we made," based on future rentals of the studio. He failed to explain either how much of a portion or for how long the profit-sharing arrangement would last, but did say those payments would "go back into Axanar Productions so we can continue telling the story of Axanar and fulfilling our commitments to donors."
  
-<WRAP> +==== State of the Campaign ==== 
-//**__State of the Campaign__**// + 
-</WRAP> +[{{::backerkitapr18.jpg?direct|**MORIBUND CAMPAIGN** BackerKit's analysis of Axanar's Indiegogo prospects remained pessimistic, with daily donations and donors plummeting to zero and below. <wrap lo><wrap indent> Click image to enlarge.</wrap></wrap>}}] \\
-[{{::backerkitapr18.jpg?direct|**MORIBUND CAMPAIGN** BackerKit's analysis of Axanar's Indiegogo prospects remained pessimistic, with daily donations and donors plummeting to zero and below. <wrap lo><wrap indent> Click image to enlarge.</wrap></wrap>}}]+
 ===== Indiegogo Donations ===== ===== Indiegogo Donations =====
  
Line 101: Line 100:
 Peters appealed to Axanar fans in the Los Angeles area to help load trucks and move out of Industry Studios on April 28-30. The scheduled move into the Atlanta facility was scheduled May 6-7. Peters asked for Atlanta volunteers to unload and move in, and noted that a team from another Star Trek fan production would be helping, too. Peters appealed to Axanar fans in the Los Angeles area to help load trucks and move out of Industry Studios on April 28-30. The scheduled move into the Atlanta facility was scheduled May 6-7. Peters asked for Atlanta volunteers to unload and move in, and noted that a team from another Star Trek fan production would be helping, too.
  
-He did not name the production. Among the Georgia-based fan films are longtime rival [[http://trekcontinues.org|Star Trek Continues]], [[face>startrekfirstfrontier/|Star Trek: First Frontier]] and, formerly, [[http://www.starshipfarragut.com|Starship Farragut]] and [[http://potemkinpictures.com|Potemkin Pictures]]. Continues, which completed its production run, has its own production facility in Georgia. Potemkin moved its main production facility to the Birmingham, Alabama, area in 2015.+He did not name the production. Among the Georgia-based fan films are longtime rival [[http://trekcontinues.org|Star Trek Continues]], [[face>startrekfirstfrontier/|Star Trek: First Frontier]], [[http://exetertrek.com/|Exeter Trek]] and, formerly, [[http://www.starshipfarragut.com|Starship Farragut]] and [[http://potemkinpictures.com|Potemkin Pictures]]. Continues, which completed its production run, has its own production facility in Georgia, used also by Farragut and Exeter. Potemkin moved its main production facility to the Birmingham, Alabama, area in 2015, with a small production team remaining in Atlanta
  
 Peters promised "food and swag for everyone who helps!"(([[https://www.indiegogo.com/projects/industry-studios-film#/updates|Industry Studios Indiegogo page]], Update No. 5, 4/18/17.)) {{:axamonitor-ico.gif?nolink|}} Peters promised "food and swag for everyone who helps!"(([[https://www.indiegogo.com/projects/industry-studios-film#/updates|Industry Studios Indiegogo page]], Update No. 5, 4/18/17.)) {{:axamonitor-ico.gif?nolink|}}