Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
production_update_3 [2019/02/07 16:26] – updates with Ares Digital beta testing Carlos Pedrazaproduction_update_3 [2019/09/15 15:14] (current) Carlos Pedraza
Line 25: Line 25:
 This in the midst of a Patreon campaign in which he has claimed that high tech company, Other World Computing, had sponsored the costs for the warehouse for more than a year before [[axanar_confidential#masking_the_truth|mysteriously withdrawing]] its support. In the video, Peters said: This in the midst of a Patreon campaign in which he has claimed that high tech company, Other World Computing, had sponsored the costs for the warehouse for more than a year before [[axanar_confidential#masking_the_truth|mysteriously withdrawing]] its support. In the video, Peters said:
  
-> I've been funding //Axanar//, I've been funding the studio, myself, for the past two years.(([[yout>yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))+> I've been funding //Axanar//, I've been funding the studio, myself, for the past two years.(([[yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))
  
 <WRAP 525px> <WRAP 525px>
Line 65: Line 65:
 However, that fundraising effort, and by extension the Axanar shorts themselves, cannot proceed until Ares Digital is up and running. On his January 27 live chat, Peters said the software is only 75 percent done. However, that fundraising effort, and by extension the Axanar shorts themselves, cannot proceed until Ares Digital is up and running. On his January 27 live chat, Peters said the software is only 75 percent done.
  
-Two days later he said the new system would be operational by February 1, and he would notify donors by email.(([[yout>yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))+Two days later he said the new system would be operational by February 1, and he would notify donors by email.(([[yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))
  
 [{{ :proto-patches.jpg?300|**LONG-DELAYED** patches from Axanar's Indiegogo campaign previously existed only as prototypes sold through Axanar's now-shuttered Donor Store years before they were to be shipped to waiting donors.}}] [{{ :proto-patches.jpg?300|**LONG-DELAYED** patches from Axanar's Indiegogo campaign previously existed only as prototypes sold through Axanar's now-shuttered Donor Store years before they were to be shipped to waiting donors.}}]
Line 73: Line 73:
 The next milestone is shipping patches that are owed as perks to donors to the aborted [[axanar_indiegogo_details|2015 Indiegogo]] campaign for the //Axanar// feature film. The next milestone is shipping patches that are owed as perks to donors to the aborted [[axanar_indiegogo_details|2015 Indiegogo]] campaign for the //Axanar// feature film.
  
-**AxaMonitor** reported nearly three years ago those patches had not been manufactured, apart from a small number of prototypes. Peters told viewers the promised patches — five thousand of them —had just been shipped from China and were now available for shipment to donors(([[yout>yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.)) — almost four years after the campaign.+**AxaMonitor** reported nearly three years ago those patches had not been manufactured, apart from a small number of prototypes. Peters told viewers the promised patches — five thousand of them —had just been shipped from China and were now available for shipment to donors(([[yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.)) — almost four years after the campaign.
  
 The patches cannot be shipped until people update their shipping and contact information in Ares Digital. That may pose a problem for meeting Peters' third milestone, however. The patches cannot be shipped until people update their shipping and contact information in Ares Digital. That may pose a problem for meeting Peters' third milestone, however.
Line 87: Line 87:
 But this new information throws even that estimate into doubt, as he made scheduling production contingent upon the fundraiser, itself contingent upon shipping the Indiegogo patches, and that contingent on the launch and use by donors of Ares Digital 3.0: But this new information throws even that estimate into doubt, as he made scheduling production contingent upon the fundraiser, itself contingent upon shipping the Indiegogo patches, and that contingent on the launch and use by donors of Ares Digital 3.0:
  
-> We really want you to see that we're making progress. That's what this video blog is about. … We have stakes in the ground and we're hitting our milestones moving toward production.(([[yout>yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))+> We really want you to see that we're making progress. That's what this video blog is about. … We have stakes in the ground and we're hitting our milestones moving toward production.(([[yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))
  
 === The 'Final Step' === === The 'Final Step' ===
Line 93: Line 93:
 Peters called the fundraiser "the final step" toward production. But the process he outlined appeared to be completely dependent on launching Ares Digital 3.0 and then donors registering. He offered no guarantee about when he expected that to happen: Peters called the fundraiser "the final step" toward production. But the process he outlined appeared to be completely dependent on launching Ares Digital 3.0 and then donors registering. He offered no guarantee about when he expected that to happen:
  
-> The fundraiser is the final step. How much will we raise? We don't know. Obviously, it's been a while since we raised a lot of money.(([[yout>yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))+> The fundraiser is the final step. How much will we raise? We don't know. Obviously, it's been a while since we raised a lot of money.(([[yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))
  
 Peters laid the blame on CBS for a protracted lawsuit that drained Axanar's coffers thanks to $15,000 a month he was spending because of a three-year lease he had signed on a studio he never used to shoot a single frame of //Axanar//. Peters laid the blame on CBS for a protracted lawsuit that drained Axanar's coffers thanks to $15,000 a month he was spending because of a three-year lease he had signed on a studio he never used to shoot a single frame of //Axanar//.
  
-"Sadly, CBS cost donors a lot of money," he said. "We were 30 days away from shooting the first third of //Axanar//."(([[yout>yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))+"Sadly, CBS cost donors a lot of money," he said. "We were 30 days away from shooting the first third of //Axanar//."(([[yout>VAEd8ha9wxU|Axanar Update # 3 The Road to Production]], Axanar YouTube channel, 1/29/19.))
  
 [{{ :ares_bridge_patreon-2.jpg?direct&300|**U.S.S. ARES** The recently completed //Axanar// bridge set stands in the Lawrenceville, Ga., warehouse called Ares Studios.}}] [{{ :ares_bridge_patreon-2.jpg?direct&300|**U.S.S. ARES** The recently completed //Axanar// bridge set stands in the Lawrenceville, Ga., warehouse called Ares Studios.}}]