Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
moving_the_goalposts [2016/03/09 00:36] – added memory alpha link to david g. Carlos Pedraza | moving_the_goalposts [2016/04/02 21:53] – [The 'Infrastructure Kickstarter'] Carlos Pedraza | ||
---|---|---|---|
Line 34: | Line 34: | ||
* Axanar pre-production costs, $50,000. This includes costume manufacture, | * Axanar pre-production costs, $50,000. This includes costume manufacture, | ||
- | * Axanar production costs, $325, | + | * Axanar production costs, $325, |
[{{ : | [{{ : |